our Projects

Project management, Engineering, Administration services

OAsis of the Seas amplification 2019

Working with Royal Caribbean Cruise Line to install the Perfect Storm Water Slides, Splashaway Bay childrens pool and the Ultimate Abyss dry slide (the tallest slide at sea).

Quentik worked on taking the project from concept to the finish product. Quentik Marine Ab were designing the machinery layout and piping design as well as adapting the installation to the design concepts.

The project included overseeing and leading the installation onboard the Oasis of the Seas in drydock in Cadiz, Spain.

Project management, Engineering

NAVIGATOR of the Seas amplification 2019

Working for Royal Caribbean Cruise Lines in the giant Amplification of the Navigator of the Seas.  

Quentik worked on taking the project from concept to the finish for the challenging task of putting the waterslides on the Navigator of the Seas. This includes the longest “Blaster Slide” on the seas. 

Quentik Marine Ab works included project management and engineering for the technical spaces, pump rooms as well giving technical support in the drydock that took place in Freeport, Bahamas.